General info:
Basic shot info:
Advanced shot info:
Exif-related info:
  HOME  »  School Construction »  Viewing 2005-06-10 My brother Nevin helped severl days [Image 178 of 216]  :: Jump To  
First slide Previous slide      No EXIF Info Index Page Start/Stop the slide show      Next slide Last slide
2005-06-02 Installing the last of the plywood * 2592 x 1944 * (1.31MB)

2005-06-02 Tim & Kendall Myers came over from Hephzibah to help * 2592 x 1944 * (1.24MB)

2005-06-02 Tim & Kendall Myers * 2592 x 1944 * (1.19MB)

2005-06-10 013 * 2592 x 1944 * (1.22MB)

2005-06-10 Lloyd is installing the tile in the cafeteria * 2142 x 1653 * (697KB)

 
2005-06-10 My brother Nevin helped severl days.jpg
2005-06-19 Glueing the facing strips * 2592 x 1944 * (1.32MB)

2005-06-19 Hanging carpet on the walls * 2592 x 1944 * (1.35MB)

2005-06-19 Ina Sue puts on the finishing touches * 2592 x 1944 * (1.28MB)

2005-06-30 Installing the ceiling in the gym * 2592 x 1944 * (1.28MB)

2005-07-14 Bro. Lloyd installed the bathroom cabinets * 2592 x 1944 * (1.14MB)

BluPlusPlus skin for JAlbum 4.6 created by Armond Avanes
Album last updated on 12/1/05 8:47 PM